USC ASCE Steel Bridge 2011
Bridge Design Constraints:
Is currently beinging researched by CE 456 students and our Steel Bridge co-captains.
Our Design:
Is currently being designed by our Steel Brdige co-captains.
Construction:
Unlike some other schools that have professional shops construct their bridge, we construct our entire bridge. This gives the team members hands on experience which is otherwise hard to come by. This year, the men in the machine shop are willing to help us refine our metal working skills, especially welding. Due to our design being nearly complete so early, we are hoping perfect our welds and construction skills to ensure that our bridge is as strong as possible.
Rules:
To view a complete listing of all the rules and regulations for the Steel Bridge Competition please click on the link below.
2011 Steel Bridge Rules/Regulations